Selling industrial machinery into Latin America


Machinery deals in these markets are decided before price, on certification, supplier qualification and the service answer. All three are lead time items, and all three are country specific.

Short answer. On three things settled before price is discussed: product certification that a CE mark does not satisfy, supplier qualification that precedes any tender, and a credible local service answer. Duty is mostly zero for EU-origin machinery under the trade agreements, so the real costs are certification lead time, import VAT and the service commitment.

Industrial machinery is sold in Latin America the way it is sold everywhere: on specification, on references and on total cost of ownership. What is different is what happens before any of that gets a hearing. In each of the four markets this site covers, a European machinery exporter passes through three gates that have nothing to do with the product: a certification regime a CE mark does not satisfy, a supplier qualification process that runs before any tender, and a service question the buyer asks before the price one. The money at the end of those gates is real. Consejo Minero's March 2026 figures put Chilean mining's purchases from capital goods suppliers alone at 11,344 million dollars in 2024. Winning a share of it is mostly a matter of doing unglamorous work in the right order.

The certificate comes before the quote


Three of the four markets run mandatory conformity regimes that catch industrial and electrical equipment, and none of them accepts CE marking as a substitute.

In Mexico, conformity assessment under the Ley de Infraestructura de la Calidad, published in the Diario Oficial de la Federacion on 1 July 2020, runs through Mexican accredited bodies and laboratories, and the certificate is issued to a Mexican legal person, normally your importer. That last clause is a commercial trap as much as a compliance rule: if the holder is your distributor, replacing the distributor means re-certifying every affected product in the new importer's name. We set out the consequences in who holds your NOM certificate.

In Colombia, electrical products within the scope of RETIE, established by Resolucion 90708 de 2013 of the Ministerio de Minas y Energia and amended with effect from 1 July 2026 by Resolucion 40284 de 2026, need a certificate of conformity from a body accredited by ONAC or accepted under an international mutual recognition arrangement. The fee is rarely the problem. The elapsed time is, because it cannot be compressed by paying more: see a CE mark gets you nowhere at Colombian customs.

In Chile, products within the SEC's scope need certification through an authorised body. The SEC's guidance gives that body a maximum of 90 days from receiving the application, with the testing inside the period, so the variable to pin down is the queue before your application is accepted. There is also a separate procedure for recognising foreign certification that the official product guide does not describe, and asking about it first can change the cost of the exercise entirely: see CE marking is not enough for electrical equipment in Chile.

In all three, your EU test reports can reduce the work without replacing the process. And in all three, certification belongs in the go or no-go decision rather than the shipping plan. The recurring failure among European machinery exporters is winning the order first and discovering the certificate second.

Qualification comes before the tender


Where machinery is bought by large organisations, the register is the gate, and it opens slowly.

Chilean mining is the clearest case. Codelco's supplier registry runs through RedNegocios, operated by the Camara de Comercio de Santiago, and completing accreditation there is what enables a supplier in the Portal de Compras on SAP Ariba, where the tenders actually live. Codelco awards through open tenders, private tenders and direct negotiation, and registration is the gate to all three routes: see do you need a Chilean entity to sell to Codelco. The private producers run their own qualification systems with the same shape.

Chilean public procurement is more explicit about foreigners than most systems in the region. The regulation provides a documented route for foreign suppliers using apostilled incorporation documents, and since 12 December 2024 being registered and in good standing in the Registro de Proveedores is a precondition for submitting an offer at all, not merely for signing the contract: see can a foreign company sell to the Chilean government.

The evidence says access, not technology, is where suppliers lose. A study Consejo Minero published on 27 August 2026 with the Instituto de Politicas Publicas of the Universidad Catolica del Norte and the consultancy Gestion Social found that 53 per cent of the barriers suppliers reported in Antofagasta concerned contact networks and access to procurement processes rather than technical capability. A foreign supplier faces the same barrier with an extra layer of documentation on top.

Size the opportunity by stage while you are at it. Cochilco's December 2025 investment portfolio for 2025 to 2034 stands at 104,549 million dollars, and 41 per cent of it is in execution. The funded 41 per cent is the market; the rest is a watchlist of buyers to be qualified with before their approvals land.

What machinery actually pays at the border


The duty position is the good news, provided your goods genuinely originate in the EU and you can prove it at the border.

MarketDuty on EU-origin machineryVAT at importCertification regime
MexicoUsually zero under the Global Agreement, with proof of origin16 per cent, on customs value plus dutyNOM certification, issued to a Mexican legal person
ColombiaMostly zero under the EU-Colombia agreement19 per cent, on customs value plus dutyRETIE and related regulations, via ONAC-accredited bodies
ChileEliminated on 99.9 per cent of EU exports since 1 February 202519 per centSEC certification through authorised bodies

Guatemala belongs in the same picture with a lighter border. The WTO Secretariat records 99.2 per cent of Guatemala's non-agricultural tariff lines as duty free for EU goods at an average preferential rate of zero (WT/TPR/S/477, 8 October 2025). Claim the preference with a EUR.1 or an approved exporter declaration, not the CAFTA-DR paperwork the American guides describe.

Two points matter more than the table. First, the proof of origin is a legal test about where value was added, not a statement of where the goods shipped from, and the mechanics differ by market: Chile moved to self-certified statements on origin with a REX number on 1 February 2025 and no longer accepts EUR.1, while the agreements covering Mexico, Colombia and Guatemala still run on EUR.1 certificates and exporter declarations. Exporting to several of these markets means running more than one origin process at once.

Second, Mexico raised its general import tariff twice in 2026, setting rates of 5 to 50 per cent on 1,463 tariff fractions from 1 January and of 5 to 35 per cent on 185 more from 24 April. Neither decree touches goods entering with a valid EU origin proof. For a European machinery exporter the practical effect is a relative price improvement against competitors shipping from countries Mexico has no agreement with, gained without doing anything except keeping the origin file in order.

The service question is asked before the price question


Nobody buys industrial machinery; they buy a running machine, and a buyer evaluating a foreign supplier wants to know who turns up when it stops. In Chilean mining that expectation is explicit: response times and parts availability go into the contract, sites sit in the Atacama and at altitude, and a European supplier without a local service answer is not a credible bidder for anything carrying a maintenance obligation, whatever the specification says.

The service answer also has a gate of its own. Chilean mine operators are jointly liable for their contractors' labour and social security obligations under Ley 20.123, so they demand documentary accreditation before anyone gets on site, including certificates a foreign company with no Chilean employees cannot straightforwardly produce. Commissioning engineers have been stopped at the gate on orders that were already signed: see getting your technicians onto a Chilean mine site.

Budget the tax on the service leg too. Service fees invoiced from abroad attract withholding on the gross amount in all four markets, at 20 per cent in Colombia under article 408 of the Estatuto Tributario, in bands reaching 25 per cent in Guatemala, and under Chile's impuesto adicional subject to treaty relief. On a normal service margin that is a large share of the profit, and it belongs in the quote.

Run it as a programme, not a series of orders


The exporters who do well treat the four gates as one parallel programme. Establish certification scope in every target market before quoting delivery dates. Start supplier registration with named buyers before an opportunity exists. Decide the service model, and who employs the technicians, before the first tender. Then let the commercial work run on top of a foundation that is already in place.

The exporters who struggle sequence the same steps in series, each one triggered by the previous failure. The steps cost the same either way. The difference is whether the first order lands in the year you planned or the year after, and for the country-level decisions that sit underneath this, start from the market pages for Chile, Mexico, Colombia and Guatemala.

Common questions


Is CE marking accepted for machinery in Latin America?

No. Mexico, Colombia and Chile each require conformity certification through their own accredited or authorised bodies, under the NOM framework, RETIE and the SEC regime respectively. Your EU test data can often reduce the testing required, but it does not replace the local certificate, and there is no automatic recognition of a CE declaration.

Do European machinery exporters pay import duty in Latin America?

Mostly not, with proof of origin. EU-origin machinery enters Mexico at usually zero under the Global Agreement, Chile duty free on 99.9 per cent of EU exports since February 2025, Colombia mostly at zero, and Guatemala with 99.2 per cent of non-agricultural lines duty free. VAT at import still applies and is the importer's cash flow cost.

What do large Latin American buyers require before you can bid?

Registration and qualification in their own systems, completed before the tender. Codelco enables suppliers through RedNegocios into its SAP Ariba portal, private Chilean miners run equivalent systems, and Chilean public procurement has required registration in the Registro de Proveedores before submitting any offer since 12 December 2024.

Why do machinery deals fail after the order is won?

Usually on one of three discoveries: the product needs a local certificate that takes months, the commissioning engineers cannot pass site accreditation, or the importer of record holds the certificate and the leverage. All three are avoidable by putting certification, accreditation and the service model into the plan before quoting.

PreviousDo you need a Mexican company to sell in Mexico?NextSelling to Chilean mining, and how the buying actually works

Working on this decision now?


Tell us the country, the sector and the decision you are facing, and we will come back with how we would scope it.

Noel Brunskov
Noel Brunskov
Market insights, entry and soft landing
Request a scoping call